CAVORENWELDING PROCEDURES

WELDING PROCEDURE SPECIFICATIONS · AWS D1.1 / D1.1M

AWS D1.1 welding procedures.

We prepare a complete English WPS from your project files and confirmed welding data, using the applicable prequalified rules or supporting records. If a necessary value is missing, we ask you to confirm it.

First draft within 24 hours of confirmed project information and scope, including weekends and public holidays.

Prepare my WPS

Which preparation route applies?

One complete WPS for the agreed procedure and supported range.

YOUR CONDITIONS

Prequalified requirements are met

Applicable code and contract conditions support the prequalified route.

PREPARATION

Complete English prequalified WPS

One WPS$299

YOUR RECORDS

Qualification support is needed

You have an existing PQR that is valid, applicable and covers the requested conditions.

PREPARATION

Complete English WPS based on the existing PQR

One WPS$499

Read the prequalified route or existing PQR route before you select a service. Compare the evidence needed for each route.

The preparation route is confirmed from your project conditions and supporting records.

See a complete A36 SMAW WPS example, built from a published structural-steel procedure.

What your WPS records

Project inputs are turned into procedure details and traceable ranges.

PROJECT INFORMATION
RECORDED IN THE WPS
Drawings, joint details and materials
Joint identification, base metals and geometry
Process, filler, gas and intended parameters
Process sequence, consumables and pass parameters
Thicknesses and welding positions
Applicable thickness and position ranges
Existing PQR, where required
Qualification basis and traceable record references
Preheat and interpass requirements
Applicable temperature conditions

The finished WPS records the confirmed project details and supported ranges. Use the project input checklist to collect them, or inspect the blank WPS field map.

Basis and project review

Preparation basis: AWS D1.1/D1.1M:2025 base edition with the July 28, 2026 base-edition errata. AMD1 is not included. Contract requirements and any required project or Engineer acceptance remain part of your project review.

Read the edition and amendment scope.

What if my existing PQR may apply, but the records are incomplete?

Send the records you have. We identify the missing information needed to confirm the preparation route.

What does “complete WPS” mean here?

One complete English WPS draft for the agreed welding conditions and supported ranges, delivered as a PDF and an editable Word file for your project review.

Can I submit the WPS to the project owner?

Yes. Review the WPS and submit it through your project process. Acceptance depends on the project requirements and review; comments within the agreed scope are covered by the included revisions.

How soon will I receive my WPS or revisions?

We deliver your first draft within 24 hours after the project information and scope are confirmed, and included revisions within 24 hours after the comments and revision scope are confirmed. Weekends and public holidays are included. Need it sooner? Tell us your deadline in advance; we will confirm whether our schedule allows it.

What revisions and refunds are included?

Each order includes two revision rounds requested within 30 calendar days of first delivery. We correct our errors free of charge. Cancel before preparation starts for a full refund. See the revision and refund policy.