Record the main Clause 5 gates and identify known route failures or missing evidence.

View result ↓

Code scope and process

Screen Clause 1.1 scope (including ≥1/8 in [3 mm] and specified minimum yield strength ≤100 ksi [690 MPa]); mark Yes only after checking actual material and design basis.

Clause 5 evidence

Record each member separately; similar strength or a trade name is not a match.

Include CJP/PJP/fillet, backing, root opening, root face, angle, access and backgouging. Tubular requires Clause 10 review.

Do not treat an HSS member alone as proof that Clause 10 applies or does not apply.

RESULTExample
—

Choose the conditions to see the result.

Route and variable screening
Need a WPS for a real project?

Share your project details and supporting records. We’ll review the route and scope before preparation.

Order a WPS
Scope & references AWS D1.1 / D1.1M:2025

2025 base edition with July 28, 2026 errata. AMD1 not included.

Use the checklist for the Clause 5 route; review tubular and special contract provisions where applicable.

Decision sequence

Check the code scope and loading, process eligibility, each base metal, filler, joint detail, preheat, process table, Table 5.5 variables and special branches.

Using the result

Use the result to organize the procedure review and identify remaining conditions.

Continue this WPS review

Check each known Clause 5 input, then resolve the remaining project conditions before selecting the route.