Prequalified WPS route checker
Record the main Clause 5 gates and identify known route failures or missing evidence.
RESULTExample
—
Choose the conditions to see the result.
Code screening · verify the complete WPS and project requirements
Need a WPS for a real project?
Order a WPS Share your project details and supporting records. We’ll review the route and scope before preparation.
Scope & references AWS D1.1 / D1.1M:2025
2025 base edition with July 28, 2026 errata. AMD1 not included.
Guided checklist only; tubular and special contract cases need complete specialist review.
Decision sequence
Check the code scope and loading, process eligibility, each base metal, filler, joint detail, preheat, process table, Table 5.5 variables and special branches.
Result boundary
Clause 5 route screening is not engineering approval, WPS signature, personnel qualification or weld acceptance.