Record the main Clause 5 gates and identify known route failures or missing evidence.
Choose the conditions to see the result.
Share your project details and supporting records. We’ll review the route and scope before preparation.
Scope & references AWS D1.1 / D1.1M:2025
2025 base edition with July 28, 2026 errata. AMD1 not included.
Use the checklist for the Clause 5 route; review tubular and special contract provisions where applicable.
Decision sequence
Check the code scope and loading, process eligibility, each base metal, filler, joint detail, preheat, process table, Table 5.5 variables and special branches.
Using the result
Use the result to organize the procedure review and identify remaining conditions.
Continue this WPS review
Check each known Clause 5 input, then resolve the remaining project conditions before selecting the route.
- Prequalified versus PQR guide
Compare the Clause 5 and existing-PQR routes.
- CJP detail guide
Review one key joint-detail branch.
- WPS input checklist
Collect actual project inputs.
- Prequalified WPS preparation · $299