Use the checklist in three passes
Lock the project basis. Capture the contract’s governing standard and edition, selected unit system, design inputs and required acceptance conditions. Do not silently replace a contract edition with a newer one.
Describe the intended production weld. Identify each side of the joint, actual geometry from the drawing, thicknesses, welding position, process sequence, consumables and requested production limits.
Attach records with locators. Name each file and relevant page, sheet or detail. Mark unknown items as unknown and identify who can resolve them; a blank is not evidence that a condition is absent.
Project and code basis
Record the contractor/manufacturer and project identifiers, drawing numbers and revisions, code designation and edition stated by the contract, unit system, structural category or loading conditions, and any Engineer or client requirements. Note whether CVN, PWHT, seismic, fatigue, corrosion or other special conditions are specified. Attach the relevant specification or mark the exact document location.
Keep requested conditions distinct from engineering decisions. For example, record “CVN required at −20 °C per project specification section X” with its source.
Joint and base-metal information
- Identify member 1 and member 2 separately: specification, grade/class, product form and delivery condition.
- Record actual base-metal thickness on each side and the production thickness range requested.
- Identify CJP, PJP, fillet, plug or slot weld as applicable; give weld size, effective throat or penetration requirement.
- Provide drawing/detail ID and revision, joint orientation, groove type and dimensions, root opening/face/radius, backing, backgouging and fit-up tolerances.
- State plate, pipe or tubular construction; include outside diameter and connection type where relevant.
- Give intended welding positions and vertical progression where applicable; distinguish production orientation from any test position in qualification records.
A joint callout or a weld symbol alone may not show every dimension needed for a production WPS. Supply a dimensioned detail or approved drawing reference rather than guessing omitted geometry.
Process, consumables and production conditions
For each process segment, state process, operation (manual, semiautomatic, mechanized or automatic), sequence and pass role. Provide filler AWS specification/classification, manufacturer and product, diameter, and the actual gas classification/composition and flow for gas-shielded processes. Include polarity/current type, power-source characteristic, transfer mode, waveform controls, flux and SAW setup when those fields apply.
Provide the parameter source for the intended production settings: client procedure, equipment/product datasheet or other identified basis. Separate root, fill and cap ranges when they differ. Include heat-input limits, preheat/interpass conditions, PWHT, cleaning, consumable storage, weather constraints, tacks and sequence where required by the project or production plan.
When an existing PQR may be needed
Send the full legible qualification record and its supporting test reports, not just an old WPS or an unreadable summary. For every PQR, capture its identifier and revision, manufacturer on record, code edition, test date, test assembly type, weld type, base materials and thicknesses, position/orientation and pipe or tubular diameter where applicable.
Include process-by-process actual values and deposited weld-metal thickness, filler/gas/electrical details, preheat/interpass and PWHT records, and test reports for mechanical tests, NDT and CVN when required. Record page numbers or file locations; mark any missing required test result unresolved.
Gap log and handoff
For every unanswered item, record the missing fact, expected source, resolver and effect on the route. Ask a focused follow-up tied to that gap.
Editable checklist contents
The CSV is a working register with columns for workstream, field, requested information, evidence/source locator, status and follow-up owner. Add rows for multiple joints, materials, process segments and records. It contains no prefilled customer or qualification data.
Download the CSVSource and limits
Prepared from Cavoren’s AWS D1.1/D1.1M:2025 WPS intake and delivery references, including the Clause 5 and existing-PQR evidence distinctions. The service reference basis records the 2025 base edition and its 2026-07-28 base-edition errata; AMD1 is not included. Contract-specified editions take precedence. This checklist is an original collection aid, not an AWS publication, qualification decision, engineering design review or substitute for the governing standard and project documents.
Convert drawing weld IDs into a WPS coverage register
Start with the drawing revision and weld callout, then collect the detail behind the symbol. Record both materials and thicknesses, weld type and required size, joint geometry, backing/removal, position and access, process, temperatures and special requirements. A weld symbol identifies design intent; it rarely supplies every production variable needed for a WPS. Ask the drawing owner to resolve missing design dimensions rather than choosing them while filling the form.
| Register column | What it connects |
|---|---|
| Drawing/revision + weld ID | The exact production location and callout |
| Material pair, thickness, joint and position | The target conditions to be covered |
| WPS number/revision + route | The proposed controlled production instruction |
| PQR ID / Clause 5 evidence | The support reviewed for that weld |
| Restrictions and unresolved items | CVN, PWHT, access, geometry or missing facts that prevent issue |
Example: a beam, a column and a stiffener do not automatically need three WPSs. They may reference the same supported procedure when their actual conditions fit it. Conversely, two welds on one beam may need different procedures if their process, joint or support differs. The fixed-price offer is one WPS, not an unlimited project package. Use the coverage matrix for supporting PQR checks and keep this weld-to-WPS register linked to the current drawing revision.
Customer facts versus ranges derived during preparation
| Customer/project evidence | Preparation work using that evidence |
|---|---|
| Actual drawing, materials/MTR, thickness, position, access and joint dimensions | Select and check the applicable detail and coverage branch without redesigning the joint |
| Named consumable/product, gas/flux, equipment mode and usable operating data | Map documented parameters to WPS rows and applicable code limits |
| Original PQR, pass records and test results where needed | Derive only the supported production scope and record its restrictions |
| Contract CVN/PWHT requirements, customer instructions and real approvals | Apply the corresponding additional checks and identify unresolved items |
Preparation turns the supplied facts into supported limits and a complete document. Identify who will resolve missing inputs; record the selected option and its source wherever the project allows a choice.