Complete one row for each decision
Use the CSV as a repeatable register. Duplicate a row when there are multiple joints, base-metal sides, process segments, PQRs, pass roles or special conditions. Do not collapse distinct evidence into a single general “reviewed” entry.
| Register field | What a useful entry contains |
|---|---|
| Evidence locator | Controlled filename plus page, table, drawing/detail, report, sheet/cell range or manufacturer document revision. “PQR attached” alone is not a locator. |
| Route / basis | Clause 5 prequalified condition and precise applicable reference, or Clause 6 qualification branch tied to a real PQR and segment. Include contract edition where it governs. |
| Disposition | Accepted, unresolved or not applicable, with a reason for any item marked not applicable. |
| Reviewer / action | Reviewer identity and a concrete next action, or the closure evidence/reference. |
1. Lock document identity and scope
- Confirm the governing AWS D1.1/D1.1M edition from the contract and preserve any older edition actually used by an existing PQR. Do not relabel an old record as 2025.
- Record the unit system used in the WPS and check that each value and range uses that system consistently.
- Match project, manufacturer, WPS identifier/revision, drawing numbers/revisions and intended production weld to the controlled source documents.
- Capture weld type and actual design dimensions from the drawing. Confirm whether the target is CJP, PJP, fillet, plug, slot or a tubular connection; confirm plate/pipe/tubular applicability.
- List contract requirements that affect the WPS, including CVN, PWHT, seismic or other expressly specified conditions. A silent or missing mention is unresolved until its status is established.
Close a scope discrepancy by identifying the controlling document and revision, not by choosing whichever value is easiest to support.
2. Apply the Clause 5 prequalified route
- Confirm the process is eligible for the proposed Clause 5 route. In particular, do not label GMAW-S prequalified; it may be considered only through a genuinely applicable qualification route.
- For each base-metal side, trace specification, grade/class, product condition and thickness to a material certificate or controlled project record. Apply the actual material-group and thickness conditions; do not infer a group from a stronger grade name.
- Trace the joint preparation and dimensions to the complete applicable detail and its notes/footnotes. Verify groove, root opening/face/radius, backing or backgouging, position, thickness limits and any detail-specific restriction. A detail number alone does not prove the required geometry.
- Check filler classification/product, diameter, polarity/current, position, transfer mode and shielding gas as applicable against the relevant prequalification conditions and actual manufacturer/client operating information.
- Establish minimum preheat and interpass limits from the applicable material category, thickness, hydrogen and project conditions. Check PWHT and any other special restriction separately.
- Populate production parameters from a matched product/process/diameter/position/gas source. Table 5.5 is an operating tolerance around chosen settings where applicable; it is not a source of recommended settings. Do not apply its GMAW values to SMAW.
- Check thickness/size and position coverage for the actual weld type and detail. Do not borrow a fillet, groove, plug/slot, tubular or other branch's range.
- Record the selected route as accepted only when each applicable prerequisite is supported. If the prequalified basis fails or remains unproven, check for a real existing PQR; do not infer that new qualification is required from a missing intake field.
3. Apply the existing-PQR Clause 6 route
Use one evidence chain per PQR and process segment. The PQR's actual recorded facts, the range supported by the applicable qualification rules and the range selected for production are three different entries.
- Verify PQR ID/revision, manufacturer, test date, actual qualification edition, coupon identity and legibility. Link original record pages and supporting test reports. An old WPS or summary alone is not the underlying qualification record.
- Classify the actual test assembly and branch: plate, pipe or tubular; CJP, PJP, fillet, plug/slot or direct qualification method; backing/backgouging; position/orientation; and diameter where relevant.
- Record both base-metal sides, material combination, coupon thickness and actual production target. Apply the matching qualification table/branch, including material-combination conditions. Do not treat “higher strength” as blanket coverage.
- For each process segment, transcribe actual sequence, pass role, filler/product/classification/diameter, gas, electrical/transfer/waveform conditions, parameter values with units and source locator.
- Record actual deposited weld-metal thickness and pass data by process from the PQR/records. Keep it separate from base-metal thickness; do not derive per-process deposit from total coupon thickness.
- Derive member thickness, weld type/size, position/orientation and tubular coverage using the appropriate qualification branch. Plate mappings do not establish tubular coverage. Cite the exact table/paragraph, relevant notes and the conditions applied.
- Where CVN is required, link the requirement source to test temperature, specimen/location/size, report/results and acceptance basis, then check applicable supplementary variables. Do not claim CVN qualification based on a filler classification or absent report.
- Where PWHT applies, compare actual PQR condition and evidence with the production requirement and applicable variables. Do not fill an unrecorded production cycle from expectation.
- For waveform-controlled processes, identify equipment/program and actual energy evidence where the applicable rule needs it. Do not infer waveform heat input from ordinary average current and voltage.
- Preserve variable associations and the PQR supporting each process/pass. Do not combine unrelated PQR extremes into a synthetic range or use Clause 5/Table 5.5 tolerances on a PQR-based WPS.
If the records are insufficient, mark the exact unsupported field unresolved. This can limit one range or special condition while other supported scope remains usable.
4. Check the finished document and release gate
Before release, confirm required fields and numerical ranges have traceable support, joint details and production instructions match the project basis, and identifiers, units, revisions and locators agree throughout. Keep unresolved required fields out of a production WPS. Approval fields are for the responsible reviewer. For fabrication conditions, see the fabrication conditions guide.
How the checklist fits the service routes
The service covers Clause 5 preparation when the target meets its requirements, or Clause 6 preparation from an applicable existing PQR. New qualification testing is outside the service.
Original review aid based on Cavoren’s WPS preparation and delivery references for AWS D1.1/D1.1M:2025 base edition plus the project-recorded 2026-07-28 base-edition errata; AMD1 is excluded. Contract-specified editions govern.
Work through a returned WPS without losing the evidence trail
- Log each reviewer comment, affected WPS field and the cited drawing/contract requirement.
- Classify it as a missing customer fact, document mismatch, unresolved qualification evidence or actual change beyond support.
- Obtain the missing source or compare the proposed change with the relevant Clause 5/PQR requirements.
- Revise the WPS and return a response showing the changed field, revision and supporting source; leave unresolved comments open.
- Submit the revised document to the project’s authorized reviewer.
Illustrative return: “The drawing requires backing removal; the submitted WPS leaves it in place.” Check the drawing revision and selected joint detail first. For a PQR route, inspect the actual backing/backgouging condition and applicable variable before changing the instruction. If support exists, correct the WPS and record the reason; if it does not, do not close the comment by editing the wording alone.