WPS variable change checker
Compare an operating change against the correct prequalified WPS or PQR route.
Choose the conditions to see the result.
Share your project details and supporting records. We’ll review the route and scope before preparation.
Scope & references AWS D1.1 / D1.1M:2025
2025 base edition with July 28, 2026 errata. AMD1 not included.
Compare PQR test variables and qualified ranges independently from nominal WPS values. Enter one categorical variable at a time; unknown process-specific Table 6.6 cases remain unknown.
Prequalified WPS
Table 5.5 tolerances maintain the written WPS: amperage ±10%, voltage ±15%, travel speed ±25%, non-amperage-controlled wire-feed speed ±10%; shielding gas flow +50%/-25%. Numeric checks apply only where Table 5.5 lists the variable for that process.
PQR-qualified WPS
Table 6.6 triggers: amperage ±10% SAW/GMAW/FCAW and ±25% GTAW; voltage ±7% SAW/GMAW/FCAW; travel speed ±15% SAW / ±25% GMAW-FCAW / ±50% GTAW; non-amperage-controlled wire feed ±10%; gas flow >+50%/-20% for GMAW/FCAW-G/GTAW. Process-specific rows/footnotes apply.
Continue this WPS review
Describe the proposed change and compare it with the actual qualification record and governing route.
- Revision or requalification guide
Read the broader change-review method.
- PQR essentials
Check actual recorded variables and qualification basis.
- PQR coverage matrix
Map proposed production conditions to evidence.
- WPS preparation from an existing PQR · $499
See required inputs and the contents of the finished WPS.