Material evidence · Heat input and temperature
Q&T / TMCP steel: what evidence belongs in a WPS review?
For Q&T and TMCP steels, set heat-input and temperature limits from the delivered condition, producer guidance, applicable Code route and PQR support.
Identify the delivered steel condition
Q&T and TMCP use different processing routes. For each base-metal side, record the grade, product form, thickness, heat or lot traceability and delivery condition from the material specification and MTR.
| Evidence question | Q&T steel | TMCP steel |
|---|---|---|
| What does the material record establish? | Record the quenched-and-tempered delivery condition, grade and product form shown on the MTR. | Confirm the exact thermomechanically controlled processing condition and grade from the MTR and material specification. |
| What producer limit is needed? | Obtain the grade/product-specific maximum heat input and maximum preheat/interpass recommendations required for the proposed welding condition. | Use applicable grade/product guidance for heat input and temperature. |
| What does the code route add? | Clause 7.7 imposes Q&T production heat-input control together with maximum preheat and interpass limits, based on the producer’s recommendations. The provision excludes ASTM A913/A913M from that particular 7.7 heat-input limitation; other Code and project conditions still apply. | Check the TMCP material-specific Code and contract requirements, including CVN, preheat/interpass or PWHT conditions. |
Map each source to the WPS field it supports
| Source evidence | WPS or review field | Boundary |
|---|---|---|
| MTR and material specification for every member | Base-metal specification/grade, delivery condition, product form and thickness | Supports material identity and applicable table lookup; it does not set a welding temperature by itself. |
| Producer welding guidance for the exact grade/product and revision | Maximum heat input, maximum preheat/interpass temperature and any stated restrictions | Record the condition, units, process and thickness range covered by the guidance. |
| Applicable PQR and original reports | Qualified process, materials, joint, actual parameters, preheat/interpass, heat-input and CVN evidence | Record PQR support separately from the producer’s production limit. |
| Contract, design documents and Engineer direction | CVN, service temperature, acceptance criteria, any project maximum temperature or heat-input controls | Record CVN acceptance energy, test temperature and design direction from their governing source. |
| Production monitoring records | Measured current, voltage, travel speed/heat-input method, preheat and interpass temperatures | For waveform processes, record instantaneous energy/power when required instead of assuming an average A×V calculation. |
Separate the three limits
Producer recommendation: a material-specific restriction intended to preserve the properties of that steel and product condition. It can set a maximum heat input or temperature that is tighter than a code qualification envelope.
PQR support: the range and conditions demonstrated by the actual qualification record, with the applicable essential and supplementary variables. Where CVN applies, heat input and Table 6.8 conditions can further constrain an existing PQR-based WPS.
Production control: the values and limits written on the WPS and measured in production. They must respect the applicable Code, PQR, producer and contract constraints together.
Manufacturer references
- SSAB Welding Handbook — producer guidance for Hardox and Strenx steels, including thermal cycles, consumables and welding recommendations. Use the exact grade and edition relevant to the MTR.
- SSAB, Welding of Strenx (2026 edition) — grade-family guidance with product-specific recommendations.
Code basis and related guides
AWS D1.1/D1.1M:2025 base edition plus registered 2026-07-28 base-edition errata, excluding AMD1. Review 6.8.4–6.8.5 and relevant supplementary variables, 7.6–7.8, material-specific provisions and the governing contract.
Send the project drawing, exact consumable or material identification, and complete supporting records where applicable.
Continue this WPS review
Connect the actual delivery state and producer thermal guidance to supported WPS fields.
- Minimum preheat and measurement
Compare code minima with actual material limits.
- CVN qualification evidence
Check the relevant test reports and supplementary variables.
- Thermal and pass records
Record the measured settings and their source.
- Prequalified WPS preparation · $299
See required inputs and the contents of the finished WPS.
- Existing-PQR WPS preparation · $499
See required inputs and the contents of the finished WPS.