CAVOREN WPSAWS D1.1 WPS preparation

Temperature control · Clause 5 and Clause 6

How do you set interpass temperature in an AWS D1.1 WPS?

A WPS needs a temperature rule that can be applied before each pass. The minimum is linked to the applicable preheat or qualified minimum. A maximum is a separate limit when required by the material, CVN qualification or project. There is no universal maximum interpass number for every steel and process.

Keep the lower and upper bounds distinct. For the prequalified route, determine the minimum from both base metals, process and thickness under Table 5.11 and applicable project rules. For a PQR route, derive the WPS minimum under 6.8.4 and retain the tested/qualified temperature evidence; add an applicable maximum when CVN or the material requires it.

Use the right source for each route

WPS routeMinimum interpass evidenceMaximum interpass question
Clause 5 prequalifiedCheck each material's Table 5.11 category for the actual process/electrode condition and the thickest part at the weld; use the governing minimum with Clause 7.6 and project conditions.Check material-specific requirements, the project and any toughness condition. Do not insert a generic 250°C ceiling.
Existing PQR under Clause 6Under 6.8.4, establish the qualified minimum preheat; minimum interpass equals that qualified minimum. Keep the coupon's actual temperatures and chosen WPS minimum traceable.Where CVN is required, or the material requires it, list the maximum in the WPS and review Table 6.8 supplemental variables and any producer limit.

For a PQR coupon, if the weld cools below the qualified minimum before a further pass, reheat to at least that minimum before welding resumes. A blank coupon temperature log cannot be treated as a measured minimum. The weld parameter record separates actual pass observations from proposed WPS settings.

Bounded example: a minimum is not a maximum

Suppose the supported Table 5.11 result for a specific two-member, 25 mm, GMAW joint is 65°C (see the two-member preheat example). The WPS review uses that as a minimum temperature starting point under the stated assumptions and any higher project requirement. It does not infer a maximum of 250°C or any other value. If a contract requires CVN, a producer limits a Q&T steel, or the project specifies a maximum, obtain that evidence and check the route-specific qualification implications before setting the upper bound.

The required measurement is the temperature in the prescribed weld region before the next pass, not merely the heating-device setting. Clause 7.6 controls the heated region and pre-pass checks. Record the measurement point, instrument/method, pass, time and actual reading when a production log is required.

Review a proposed change

  1. Identify whether the WPS is prequalified or PQR-based and the project's edition, steel condition, process and CVN requirement.
  2. Trace the proposed minimum to the governing material and thickness calculation or the qualification-test method. Do not use a different steel's category.
  3. Ask whether a maximum is required by material producer, CVN qualification or contract, and record its exact source and unit system.
  4. For a PQR-based WPS, compare the change with the applicable Table 6.6 variables and, where CVN applies, Table 6.8. A table trigger is a requalification check, not an automatic operating range.
  5. Write the field instruction and pre-pass measurement point so welders can actually apply the limit.

Code basis and scope

Basis: AWS D1.1/D1.1M:2025 base edition plus registered July 28, 2026 base-edition errata; AMD1 is excluded. Relevant provisions include Table 5.11 and Clause 5.7 for the prequalified temperature route, Clause 6.8.4 and Table 6.8 for qualification and CVN-related limits, and Clause 7.6 for production temperature control. Q&T steel and material-specific heat limits require the steel producer's applicable recommendations. The contract edition and project documents govern.

This guide does not set a temperature for an unidentified steel, infer a maximum from an electrode name, or validate an actual PQR. Use the underlying records for those decisions.

Need a WPS with traceable interpass controls?

Provide both material records, the temperature requirement, process and any PQR/CVN evidence.

Start a WPS request