CAVOREN WPSAWS D1.1 WPS preparation

Worked example · AWS D1.1/D1.1M:2025 Clause 6

GMAW-S PQR-to-WPS example: a complete synthetic training case

SYNTHETIC TRAINING DATA — NO WELDING OR TESTING TOOK PLACE. Every record identifier, material certificate, procedure value, coupon detail, test count and assumed outcome below is fictional and was created for instruction. There is no actual PQR, laboratory, test report, signature, approval, company record or production result. This is not an issued or usable production WPS and does not establish qualification.

This exercise follows one fictional plate CJP record through its training inputs, Clause 6 coverage derivation and a deliberately narrow final WPS. GMAW-S follows the Clause 6 qualification route; it is not a Clause 5 prequalified process.

Scenario: one 6 mm ASTM A36-to-A36 plate CJP groove weld, tested in the fictional record at 3G vertical-up with steel backing. The final example covers that same material pair, thickness, joint detail, position, process, consumable, gas and exact recorded parameter set. It does not combine independent parameter extremes.

Download the synthetic input and field-by-field coverage CSV · Download the complete WPS preview (HTML)

1. Fictional input record

The table below gives the complete stipulated training input. “Recorded” refers to a fictional exercise value.

Record fieldSynthetic training valuePurpose in this exercise
Code and unitsAWS D1.1/D1.1M:2025 base edition; registered 2026-07-28 base errata; AMD1 excluded; SILocks the stated rule basis.
Fictional record IDsTraining organization: EXAMPLE FABRICATOR; PQR TR-GMAWS-001 Rev T0; WPS TR-GMAWS-001 Rev T0Identifiers are visibly reserved for training.
CouponNon-tubular plate; two 6 mm ASTM A36 plates; CJP single-V butt joint; 3G vertical-up; transverse-bend layout plate 510 mm × 360 mm minimum under Figure 6.7(2) (synthetic dimensions)Defines the branch and the tested condition.
Joint and backing60° included groove angle; 2 mm root opening; 1 mm root face; 6 mm × 25 mm carbon-steel backing; one side welded; no backgouging; backing retainedFinal WPS repeats this exact configuration.
Process and sequenceGMAW-S only; conventional non-waveform-controlled CV power source; DCEP; vertical-up; three stringer passes, root/fill/cap; synthetic deposit allocation 2/2/2 mmNo process segment or deposit value is borrowed from another record.
Filler and gasAWS A5.18/A5.18M ER70S-6 solid wire, 0.9 mm; argon 75% / CO₂ 25%; 15 L/minClassification, diameter and gas composition remain fixed.
Per-pass recorded parameter set110 A; 18.0 V; 3.8 m/min wire-feed speed; 200 mm/min travel speed; same stipulated set for all three passes
TemperatureCoupon preheat recorded as 20°C; stipulated minimum interpass 20°C; no maximum specified for this non-CVN exampleThe example WPS uses a 20°C minimum.
Heat treatment and CVNNo PWHT; contract CVN requirement stipulated “No”Table 6.8 CVN supplementary variables and PWHT branch are not invoked by the stated assumptions.
Qualification test recordFictional assumed test set for a 3–10 mm CJP plate test: VT; RT of the entire weld length except discard lengths at each end before specimen cutting; 2 reduced-section tension, 2 root bends, 2 face bends; all outcomes stipulated “pass” for the exercise
External recordsNone suppliedThese missing real-world records prevent use as a production document.

2. Field-by-field qualification derivation

DimensionTraining record valueCode-supported result for the fictional branchFinal WPS choiceRule check
Route / processGMAW short-circuit transfer (GMAW-S)Clause 6 qualification route; not prequalified under Clause 5GMAW-S only5.5.1–5.5.2; 6.16.1.1
Coupon type / weldNon-tubular plate CJP grooveUse plate CJP qualification branchPlate CJP butt groove only6.5–6.6, 6.11, Table 6.2
Base-metal pairA36 / A36, each assigned Group II for this all-thickness entryGroup II-to-II record supports the Table 6.9 combinations, including Group II-to-II; material identity still must match the targetASTM A36 to ASTM A36 onlyTable 5.6; 6.8.3; Table 6.9
Coupon thicknessT = 6 mmPrinted SI row 3–10 mm; qualified base-metal thickness 3 mm minimum to 2T = 12 mm maximum6 mm onlyTable 6.2, 3–10 mm row. This is base-metal thickness, not deposit thickness.
Position / progression3G plate, vertical-upPlate CJP 3G supports production vertical position (V)V, vertical-up only6.4; Table 6.1. This does not establish welder qualification.
Joint detail / backingSingle-V, 60°, 2 mm opening, 1 mm face, steel backing retained, no backgougeUse the same stipulated CJP configuration; omission of backing or a material change to the test arrangement is outside this narrow exampleExact stated detail only6.6 Table 6.6 general joint variables; 6.11.1; 6.7
Process depositThree GMAW-S passes; stipulated deposits 2 + 2 + 2 = 6 mmNo generic per-process multiplier is inferred from Table 6.2. Retain the fictional pass record and its exact sequence.Three passes, same sequence; 6 mm total deposited metal6.7; read process deposit from the record, not the coupon thickness.
Filler / diameterER70S-6, 0.9 mmNo change is selected. Any classification or diameter change must be assessed under the applicable Table 6.6 row and other applicable requirements.ER70S-6, 0.9 mm only6.7–6.8; Table 6.6.
Transfer / current / sourceGMAW-S; DCEP; CV; non-waveformNo mode, polarity, source characteristic or waveform change is selected.Same values onlyTable 6.6; 6.8.5 applies to heat-input calculation only when CVN is contractually required.
Amps / volts / WFS / travelEach pass: 110 A / 18.0 V / 3.8 m/min / 200 mm/minFinal selected point equals each fictional PQR value (zero change); this avoids using the Table 6.6 thresholds as invented operating ranges.Same point set for root, fill and capTable 6.6 GMAW rows: any proposed change is compared to actual process records; the table limits are requalification triggers, not automatic WPS ranges.
Shielding gasAr 75% / CO₂ 25%, 15 L/minNo composition or flow change selected.Same mixture and 15 L/min onlyTable 6.6 GMAW gas rows; 6.7 requires recorded WPS variables.
Preheat / interpass20°C stipulated preheat; stipulated minimum interpass 20°CMinimum preheat is established by the fictional qualification test under 6.8.4.1(3); minimum interpass equals the qualified minimum preheat under 6.8.4.2.Minimum preheat 20°C; minimum interpass 20°C6.8.4; any decrease from PQR minimum remains subject to Table 6.6 and 7.6.
CVN / heat inputContract CVN: NoTable 6.8 supplementary CVN variables and 6.8.5 CVN heat-input limit are not triggered by this stated assumption.No CVN requirement stated; no qualified heat-input limit in this example6.8.1 and 6.8.5; a real contract could change this branch.
PWHTNoneNo addition or deletion relative to the stipulated record.No PWHTTable 6.6 PWHT variable; Clause 7 and project requirements still apply.
Tests / validityAssumed synthetic VT, RT, tensile and bend statusesClause 6.11.3 requires visual inspection, completed-coupon NDT, bend tests and tensile tests. Under 6.10.2, RT or UT examines the entire weld length except end discard lengths before mechanical specimen cutting; the synthetic scenario stipulates RT. Nothing was actually tested.Training demonstration only6.10.1–6.10.3, 6.11.3 and Table 6.2. Real NDT and mechanical-test reports are indispensable for production issue.

Table 6.6 limits do not create a free Cartesian product of amperage, voltage, WFS, travel speed, gas and filler values. This example selects one parameter set, joint configuration and base-metal pair. Its coverage derivation assumes a complete successful record as stipulated for the exercise.

3. Complete training WPS

The download below contains the complete English WPS form for this exercise: document control, application limits, supporting record, base metals, joint geometry, pass/deposit matrix, parameter schedule, temperatures, CVN/PWHT status, production technique and document control.

WPS fieldFinal training value
ScopeSingle non-tubular 6 mm A36-to-A36 plate CJP single-V butt joint; 3G vertical-up; one-side GMAW-S over retained steel backing.
Pass planThree stringer passes in root/fill/cap order; stipulated deposit 2 mm per pass, 6 mm total.
Parameters (each pass)ER70S-6 0.9 mm; DCEP; CV; GMAW-S; 110 A; 18.0 V; WFS 3.8 m/min; travel 200 mm/min; Ar 75% / CO₂ 25% at 15 L/min.
Temperature / special requirementsMinimum preheat 20°C; minimum interpass 20°C; no stated CVN requirement; no PWHT.

Open the complete WPS training preview · Download HTML WPS · Download input and derivation CSV

Limits before any real WPS can be issued

This exercise is not qualification evidence for an actual project. Prepare a project WPS from its traceable PQR and test records, material and filler documents, drawing, and governing contract edition.

Code basis for the rule demonstration: AWS D1.1/D1.1M:2025 base edition plus the registered 2026-07-28 base-edition errata; AMD1 excluded. Primary provisions: 5.5.1–5.5.2, 6.4–6.8, 6.10–6.11; Tables 6.1, 6.2, 6.6, 6.8 and 6.9. Clause/table references identify the rule path; consult the standard and applicable project documents for an actual WPS.