SYNTHETIC TRAINING DATA — NO WELDING OR TESTING TOOK PLACE. This fictional WPS does not establish qualification and is not for production use. No actual PQR, lab, report, signature, approval, company record, or test result exists. “Recorded” and “pass” below refer only to stipulated fictional inputs/statuses.

Welding Procedure Specification — Existing PQR Training Example

WPS No. / revisionTR-GMAWS-001 / T0 (fictional)Date2026-10-08 — training artifact date only
Manufacturer / contractorEXAMPLE FABRICATOR — fictional training nameProject / weld IDNone; classroom scenario
Governing codeAWS D1.1/D1.1M:2025 base edition + registered 2026-07-28 base errata; AMD1 excludedUnitsSI
Qualification basisFictional Clause 6 PQR training record TR-GMAWS-001 Rev T0. This is not a Clause 5 prequalified WPS. GMAW-S is handled through the Clause 6 route.
Record locatorSynthetic teaching dataset only; no controlled record exists.

Application and production scope

Weld type / branchNon-tubular CJP groove weld; single-V butt jointProduction position3G plate position V; vertical-up only
Base-metal thickness6 mm only for this final WPS exampleTube diameterNot applicable
Production weld size / depositCJP; stipulated three-pass total deposited thickness 6 mm (2 mm/pass)Scope limitsASTM A36 to ASTM A36 only; 6 mm plate only; exact joint, backing, process, filler, gas, position and parameter set on this form. No unlisted steel, tubular weld, other position, or alternate procedure.

Supporting qualification record — all values stipulated for training

FieldSynthetic input
PQR ID / revision; organizationTR-GMAWS-001 Rev T0; EXAMPLE FABRICATOR, fictional
Code / dateAWS D1.1/D1.1M:2025 basis stated above; no actual test date
CouponTwo non-tubular ASTM A36 plates; 510 mm × 360 mm minimum × 6 mm nominal (transverse-bend specimen layout per Figure 6.7(2), no-CVN branch); CJP single-V; 3G vertical-up
Test joint detail60° included angle; 2 mm root opening; 1 mm root face; carbon-steel backing 6 mm thick × 25 mm wide; weld from one side; no backgouging; backing retained
Process segmentGMAW-S only; conventional non-waveform-controlled CV source; DCEP; vertical-up; root → fill → cap
Filler / diameterAWS A5.18/A5.18M ER70S-6 solid wire; 0.9 mm
GasArgon 75% / CO₂ 25%; stipulated flow 15 L/min
Per-pass synthetic recorded parametersPasses 1–3 each: 110 A; 18.0 V; 3.8 m/min wire-feed speed; 200 mm/min travel speed
Deposited metalStipulated 2 mm root + 2 mm fill + 2 mm cap = 6 mm total
Preheat / interpassStipulated coupon preheat 20°C; stipulated minimum interpass 20°C; no maximum recorded as required under these no-CVN assumptions
CVN / PWHTContract CVN requirement stipulated No; PWHT none
Qualification testsFictional assumed set for 3–10 mm plate CJP: under 6.11.3, VT and completed-coupon NDT; stipulated RT of the entire weld length except discard lengths at each end before cutting specimens, under 6.10.2.1; 2 reduced-section tension, 2 root bends, 2 face bends. Teaching-only assumed acceptable status under Clause 8 Part C; no welding, RT, measured results, images, specimens, report or lab exists.
Supporting real documentsNone: no actual material certificates, filler certificates, gas certificate, drawing, contract, welding log, test report, lab, signatures, review or approval.

Base metals and qualified coverage

MemberStipulated test materialGroup assignmentCoupon thicknessCode-supported result in this fictional branchFinal WPS scope
Both membersASTM A36 plate to ASTM A36 plateGroup II to Group II (A36 appears in Table 5.6 Group II for all thicknesses)6 mmTable 6.9 Group II-to-II combination includes Group II-to-II. Table 6.2 row 3–10 mm supports base-metal thickness 3 mm minimum to 2T = 12 mm maximum, subject to the stated branch and conditions.A36 to A36; 6 mm only.

The Table 6.2 output is nominal base-metal thickness coverage. It is not a deposited weld-metal thickness multiplier. This training WPS deliberately selects only the exact 6 mm target and does not create independent extreme ranges.

Joint design and fit-up

Production detailSingle-V CJP butt joint; included angle 60°; root opening 2 mm; root face 1 mm; same as stipulated test joint
Backing / backgougingCarbon-steel backing, 6 mm × 25 mm; retained; weld from one side; no backgouging
Qualification geometryExact stipulated joint repeated; no alternate groove, backing condition, root opening, root face or angle included.
Fit-upMaintain the specified dimensions; any change requires review against the original test details, applicable code limits and project drawing.

Process, pass, and deposited-metal matrix

SequenceProcess / rolePositionStipulated depositPass count
1GMAW-S root3G vertical-up2 mm1 stringer pass
2GMAW-S fill3G vertical-up2 mm1 stringer pass
3GMAW-S cap3G vertical-up2 mm1 stringer pass
Total6 mm3 passes

Process variables and production parameter schedule

PassFiller / diameterCurrent / polarityTransfer / sourceGas / flowSynthetic PQR valueFinal WPS value
RootER70S-6 / 0.9 mm110 A / DCEPGMAW-S / CV, non-waveformAr 75% / CO₂ 25%; 15 L/min18.0 V; WFS 3.8 m/min; travel 200 mm/min110 A; 18.0 V; WFS 3.8 m/min; travel 200 mm/min
FillER70S-6 / 0.9 mm110 A / DCEPGMAW-S / CV, non-waveformAr 75% / CO₂ 25%; 15 L/min18.0 V; WFS 3.8 m/min; travel 200 mm/min110 A; 18.0 V; WFS 3.8 m/min; travel 200 mm/min
CapER70S-6 / 0.9 mm110 A / DCEPGMAW-S / CV, non-waveformAr 75% / CO₂ 25%; 15 L/min18.0 V; WFS 3.8 m/min; travel 200 mm/min110 A; 18.0 V; WFS 3.8 m/min; travel 200 mm/min

Parameter correlations and ranges: one exact set per pass as shown; no free combinations or operating ranges are authorized by this training artifact. Heat-input limit: none established for this no-CVN scenario. Waveform-controlled welding: No. SAW / ESW / EGW variables: not applicable.

Temperature and heat treatment

Minimum preheat20°C (stipulated value; for the exercise, established by the hypothetical qualification test under 6.8.4.1(3))
Minimum interpass20°C; Clause 6.8.4.2 sets the minimum interpass equal to the qualified minimum preheat
Maximum interpassNot specified for the stated no-CVN assumption; re-evaluate if the actual material, contract or code basis requires a maximum
Measurement / timingBefore welding and before resuming after the plate falls below the stated minimum; verify using a suitable temperature-measurement method and Clause 7 requirements. This form defines no actual customer instrumentation.
PWHTNone on the stipulated record; none in this training WPS

CVN and qualification test evidence

Contract CVNNo — fictional scenario assumption only
CVN temperature / results / labNot applicable under the stipulated assumption; no CVN testing took place
CJP qualification testsUnder 6.11.3, the completed coupon requires VT, coupon NDT, bend specimens and tensile specimens. The synthetic scenario stipulates RT under 6.10.2.1 of the entire weld length except discard lengths at each end, before mechanical specimen cutting; it assumes acceptance under Clause 8 Part C solely for teaching. It also stipulates the Table 6.2 3–10 mm specimen set: 2 reduced-section tension, 2 root bends and 2 face bends, with assumed teaching-only pass status. No weld, radiograph, specimen, measured result, report, laboratory or accepted PQR exists.
Failures / retestsNo real test history exists; not applicable to this fictional exercise

Production technique and restrictions

Preparation / cleaningClean joint faces and adjacent surfaces before welding; clean each pass and remove visible contamination/spatter before the next pass.
Pass techniqueThree stringer passes in root, fill, cap order; vertical-up only. Keep the stated pass sequence and backing condition.
Consumable / gas handlingUse the stated wire classification and size; keep wire clean and dry per applicable manufacturer instructions. Verify the actual gas product/composition and flow against the production equipment and governing requirements.
Tack / sequenceFit and tack to maintain the specified root opening/alignment; remove or incorporate tacks only under approved project practice and applicable requirements.
EnvironmentProtect the joint and gas shield from conditions that prevent sound welding; comply with Clause 7 and project requirements. This synthetic example supplies no site conditions.
Start / stop / backingBacking remains in place. Fill craters and remove arc starts/stops that do not meet applicable workmanship requirements.
Other restrictionsSingle process; non-tubular plate; CJP; 6 mm A36-to-A36; 3G vertical-up; exact detail and parameters only. Welder qualification and production inspection are separate requirements.

Document control

Prepared byTraining artifact; no actual preparer of a production WPS
Reviewed by / dateNOT REVIEWED — no signature
Authorized by / dateNOT AUTHORIZED — no signature

Rule references: AWS D1.1/D1.1M:2025, 5.5.1–5.5.2; 6.4–6.8; 6.10–6.11; Tables 6.1, 6.2, 6.6, 6.8 and 6.9. Base-edition errata dated 2026-07-28 applied where relevant; AMD1 excluded. The actual contract edition governs real work. This HTML is an original instructional artifact and not an AWS form.