Existing-PQR review · Clause 6
Is missing PQR information unknown, unsupported, or a need for new qualification?
A gap in a file is not itself proof that qualification failed or that new testing is required. First identify whether the fact is simply unavailable, positively outside the supported scope, or governed by a confirmed requalification trigger.
Three evidence states with different next actions
| State | What the evidence shows | Action |
|---|---|---|
| Unknown | A needed PQR page, parameter, report, material identity or contract requirement is absent, unreadable or conflicting, and the scope cannot yet be decided. | Request the specific original record or clarify the project fact. Keep only dependent WPS fields unresolved; do not claim coverage or require testing based solely on absence. |
| Known unsupported | Available records establish a limit or configuration that does not cover the requested condition, or a required variable/range is not represented in the qualification evidence. | Do not write the requested condition as PQR-supported. Narrow the WPS to supported scope or route the specific gap to qualification review. |
| New qualification / requalification required | A known proposed change crosses an applicable Table 6.6 essential-variable trigger, a Table 6.8 supplementary trigger where CVN applies, or another explicit qualification requirement. | Identify the exact clause/table row, process and condition. New testing must follow the applicable qualification path; do not make up results or imply it has already passed. |
Examples that keep the categories distinct
- Unknown: the PQR scan omits its travel-speed page. The speed needed for the target process is not established until the original record or supporting log is recovered.
- Known unsupported: a readable PQR shows one tested process arrangement, while the requested WPS adds a different process segment with no supporting qualification record. The target combined arrangement is not evidenced by that PQR.
- Requalification required: the actual PQR and proposed change are both known, and the change crosses the applicable Table 6.6 trigger for that process. If CVN applies, a Table 6.8 trigger may independently require requalification.
Request the smallest record that resolves the gap
For each unresolved item, identify: the WPS field or qualification question; the source needed (PQR variable page, original test report, material certificate, process log, contract drawing/specification); the relevant process or test segment; and which conclusion depends on it. A readable original with page provenance is stronger than a summary table without traceable source.
Missing values should not be reconstructed from a WPS range, typical manufacturer settings or another PQR unless the applicable code route and records explicitly support that use. PQR test results, failures, retests, signatures and dates must remain true to their source documents.
What can proceed while evidence is missing?
Complete independent checks that do not depend on the missing item. For example, a missing CVN report need not prevent transcription of a legible base-metal grade, but it does prevent a positive conclusion about a CVN-required WPS scope. Mark the affected field and downstream conclusion as pending instead of blocking unrelated facts or filling the gap by inference.
Use the PQR coverage matrix to track source, rule, result and missing dependency. Related guides: actual values and variable rules and older-edition PQR evidence.
Code basis and limits
This guide follows AWS D1.1/D1.1M:2025 base edition plus the registered July 28, 2026 base-edition errata; AMD1 is not included. The contract edition governs each project. Review the actual PQR, supporting test reports, applicable table notes and project requirements before issuing a production WPS.
Primary provisions: Clause 6.7–6.8, applicable Tables 6.2–6.8, and special process or joint provisions as identified above.
Use the complete qualification record and project target to set the WPS scope.
An old WPS without its PQR is not the qualification record
First identify whether the old document claims prequalified or PQR-qualified support. An old prequalified WPS can be reviewed against the actual contract edition and current target conditions; its age alone does not prove that every field is usable. For a PQR-qualified WPS, its listed production range is not a substitute for the original test record and reports.
- Copy the WPS and cited PQR identifiers, originating company, edition and dates exactly.
- Request the legible PQR, pass/variable pages and associated test reports from the actual record holder; record missing pages and unreadable fields individually.
- Compare the recovered evidence with the intended material, joint, process, thickness, position and special requirements.
- Separate “support not yet established” from a confirmed essential-variable limit. If another fully supported Clause 5 route applies, assess that independently; otherwise an unresolved PQR gap cannot become a supported $499 procedure.
Distinguish a missing record from a confirmed need for new testing. See company responsibility before relying on a record obtained from another organization.
Continue this WPS review
Identify which source record is missing, then distinguish an unresolved input from unsupported coverage.
- PQR source record log
Identify what the available source documents actually contain.
- PQR coverage matrix
Separate supported, unresolved, and out-of-range conditions.
- PQR essentials
Review the evidence expected for a coverage decision.
- WPS preparation from an existing PQR · $499
See required inputs and the contents of the finished WPS.