The suffix changes the evidence required. Identify the wire and shielding method, then follow the applicable Clause 5 or Clause 6 route.
Identify the actual process from the consumable and setup
FCAW-S (self-shielded) relies on the wire’s internal system for arc protection; FCAW-G (gas-shielded) uses external shielding gas. Identify the process from the exact product classification, manufacturer data sheet, wire label and machine setup.
| Review item | FCAW-S | FCAW-G |
|---|---|---|
| Shielding evidence | Exact product is identified as self-shielded; no external shielding gas is specified for that product setup. | Exact product data identifies the required gas or mixture, flow and operating conditions; capture the gas classification and nominal composition. |
| Clause 5 prequalified route | Potentially within the FCAW process category, subject to all applicable Clause 5 material, joint, position, filler-metal, temperature and WPS requirements. | Potentially within the FCAW process category, subject to the same full Clause 5 review plus the applicable shielding-gas requirements of 5.6.4. |
| Gas compatibility evidence | Follow the exact product instructions for the shielding setup. | Establish an applicable 5.6.4 path: classification gas, an applicable oxygen-equivalent (OE) designator range, a listed route where permitted, or the required classification testing for the exact product/gas combination. For the mixed-gas testing path, verify the manufacturer’s -M classification requirement. |
| Existing PQR route | Compare the proposed product, diameter and process variables against the actual PQR and the applicable Clause 6 rules. | Also compare gas type/mixture and flow against the actual recorded qualification variables and applicable requalification rules. Use gas values from the applicable qualification record. |
Lincoln Electric’s public FCAW guide describes FCAW-S as a distinct process and explicitly limits that guide to self-shielded electrodes; its machine/process references also distinguish FCAW-S and FCAW-G. Use those materials to identify the product and locate its supporting data.
Build an evidence packet for the wire actually being proposed
| Evidence to capture | What it answers | Where it belongs |
|---|---|---|
| Manufacturer, full trade name, AWS classification and suffixes, diameter, product data revision | Is this the exact wire and process variant under review? | Consumable record and WPS filler-metal field |
| Product data for polarity, current mode, operating range, position and technique | Does the proposed setup match the manufacturer’s product instructions? | Setup record; compare with the applicable code route |
| For FCAW-G: gas name/classification, nominal composition, flow units and product-recommended range | Is the exact wire/gas pairing supported and is the 5.6.4 path documented? | Gas evidence sheet and WPS gas fields |
| For existing PQR: original PQR and supporting reports, actual variables, material and joint coverage, CVN conditions | What was actually qualified and what limits any production WPS? | PQR-by-PQR coverage matrix |
Select current, voltage, travel speed and gas flow from the exact product’s operating data and the applicable procedure support.
Keep the two qualification routes separate
Clause 5: FCAW is among the process categories that may be prequalified only when every applicable Clause 5 condition is met. Confirm the exact AWS A5 filler classification and suffix against the applicable filler-metal provisions, then verify the joint detail, materials, position, temperature, process controls and required written variables. For FCAW-G, separately establish the gas path under 5.6.4.
Clause 6: Start from the specific PQR’s recorded product, process, size, polarity, electrical values, position, joint, material, temperature and test results. Compare proposed changes with the applicable Table 6.6 process column and any supplementary-variable table that applies. Do not apply Table 5.5 production tolerances as Clause 6 qualification ranges, or combine unrelated PQRs to fill missing values.
Check whether CVN applies and whether FCAW-S is deposited beneath another process. Under the applicable Clause 6.28 trigger, this sequence can require additional intermix CVN testing.
Useful manufacturer references
- Lincoln Electric welding guides — locate process and consumable guidance; select the exact product data sheet for the wire under review.
- Lincoln Electric AWS D1.1 certificate center — manufacturer certificate resources for product support.
Code basis and related guides
AWS D1.1/D1.1M:2025 base edition plus the registered 2026-07-28 base-edition errata, excluding AMD1. Primary provisions include 5.5–5.6, Tables 5.4–5.5, 5.6.4, Clause 6 Tables 6.6 and 6.8, and 6.26–6.28 where CVN/intermix conditions apply. Verify the current controlled code and project edition.
Send the project drawing, exact consumable or material identification, and complete supporting records where applicable.
Continue this WPS review
Identify the exact wire, shielding mode and gas evidence before choosing the procedure route.
- Parameter and gas evidence
Trace the exact wire/gas and parameter sources.
- CVN and intermix support
Separate filler toughness from required procedure evidence.
- Weld parameter record
Keep product, gas and pass-level values together.
- Prequalified WPS preparation · $299
See required inputs and the contents of the finished WPS.
- Existing-PQR WPS preparation · $499
See required inputs and the contents of the finished WPS.